Building Technology
Loading...
Smart technology creates home from home feel in top hotels
Loading...
M & E Expert Witness
Forensic Building Services Engineer
Engineering Dispute Witness
Educational Building Services Brochure
Education
BSG Vacancies
Luxury Hotel Building Services Brochure
New Director appointment Paul Stroud
Jumeirah Carlton Tower Hotel
Full refurbishment to follow on from various restaurant and suite fit-outs
Intercontinental Hotel, Park Lane
Refurbishment of 447 rooms whilst Hotel remained operational
Restaurants
Alan Yau’s Hakkasan &Yauatcha, Grissini, Rib-Room @ Jumeirah Carlton Tower Hotel, Busaba , Wiltons, One-o-One @ Sheraton Park Tower Hotel
Temperature Extremes
Nevsky, St Petersburg – 25°C
Taj, St James Court Hotel
British Embassy, Doha
Acting as Low Carbon Consultant advising project team on sustainability
British Embassy, Manila
Embassy, ancillary buildings and site services
240 Blackfriars Road (formerly UBM)
British Embassy, Cairo
Embassy, flats, ancillary buildings and site services
Cable House, London
Refurbishment of 10,000m² offices and Cat A fit-out
The Nadler Hotel, Covent Garden
A refurbishment of an older building, producing an exquisite hotel
Deputy High Commission, Chennai
Offices with large visa facilities and waiting room.
Visa Building British Embassy, Cairo
Conversion of existing building including offices, waiting room and transit flats
Bankside Hotel, London
Fitout of Hotel forming part of the major One Blackfriars development
High Commission, New Delhi
Detailed design of chillers with cooling capacity exceeding 4MW & cooling towers
Tullett Prebon, London
Infrastructure study, load analysis and recommendations for upgrade
options
De Vere Grand, Brighton
Condition surveys, designs for new services including new electrical incomer
40 Grosvenor Place, London
Phased works within occupied office including fit-out of existing basebuild
British Embassy, Amman
Condition survey and rehabilitation programme, new visa building and guardhouse.
Intercontinental Hotel, Paris
Refurbishment of 450 bed flagship Hotel. Including detailed negotiations and design
Kingdom Trade Center, Riyadh
Mixed use 300m tower block comprising offices, retail, apartments
British Embassy, Jakarta
Refurbishment of electrical services whilst buildings were occupied
AL Bustan Palace Hotel, Oman
Extensive alterations and refurbishment of prestigious Hotel
Hertfordshire County Council, Hemel Hempstead
Office fit-outs for Local Authority consolidating facilities into 3 buildings
Residence, British Embassy, Madrid
Refurbishment of Embassy building whilst occupied.
Holiday Inn, Mayfair
Fitout of new 161 room Hotel as part of the major One Blackfriars Road development
Lancey Office Center, Geneva
Alterations and additions to base build installation and office fitout.
Hyatt Regency London, The Churchill
Major Incident Recovery Works and refurbishment of guestrooms
Enskilda Bank, London
Fit-out of London office building including upgrade of electrical infrastructure
Hyatt Regency London, The Churchill
Multiple projects within this 5-Star Hotel over a period of 10 years
Intercontinental, Park Lane
Ella Canta Restaurant fitout and kitchen alterations
Visa Section, High Commission, Nairobi
New office building
Racing Post, Cannon House, London
Design of air conditioning for offices installed whilst fully occupied
British Embassy, Tel Aviv
Condition survey and rehabilitation programme.
Nevsky 25, St Petersburg
Design of M,E&P services for the redevelopment of historic building
W Hotel, Leicester Square
Detailed design and co-ordinated building services as part of the refurbishment
British Embassy, Kuwait
Refurbishment of offices whilst occupied.
Halfway Green, Walton on Thames
Design of M,E&P for new build office development
Stafford Hotel, London
Guestroom refurbishment which Hotel remained open
Ambassador’s Residence, Jakarta
Prestigious new residence with ancillary buildings, swimming pool and landscaped gardens.
242 Marylebone Road
Refurbishment and infrastructure upgrade of 8,000m²
Visa Office, British Embassy, Abu Dhabi
New 3-storey offices with phased occupation
St Ermin’s Hotel, London
Complete Refurbishment of Grade II listed building
No. 1 Palace Street, London
Refurbishment of central London offices with alterations and improvements to central cooling plant
British Embassy, Accra
New Embassy building
Staceys Street, Maidstone
Design of M,E&P design for 2 new build speculative offices in excess of 5500m² office spac
British Embassy, Kathmandu
Refurbishment of Embassy building whilst occupied
2, Babmaes, London
Full M&E Cat B Fit-Out including Lighting Design
Visa Office, High Commission, Lahore
Refurbishment of offices whilst remaining operational
British Embassy, Panama
Refurbishment of electrical services