Public Sector
Loading...
Hertfordshire County Council, Hemel Hempstead
Office fit-outs for Local Authority consolidating facilities into 3 buildings
Loading...
British Embassy, Doha
Acting as Low Carbon Consultant advising project team on sustainability
British Embassy, Manila
Embassy, ancillary buildings and site services
240 Blackfriars Road (formerly UBM)
British Embassy, Cairo
Embassy, flats, ancillary buildings and site services
Cable House, London
Refurbishment of 10,000m² offices and Cat A fit-out
Deputy High Commission, Chennai
Offices with large visa facilities and waiting room.
Visa Building British Embassy, Cairo
Conversion of existing building including offices, waiting room and transit flats
High Commission, New Delhi
Detailed design of chillers with cooling capacity exceeding 4MW & cooling towers
Tullett Prebon, London
Infrastructure study, load analysis and recommendations for upgrade
options
40 Grosvenor Place, London
Phased works within occupied office including fit-out of existing basebuild
British Embassy, Amman
Condition survey and rehabilitation programme, new visa building and guardhouse.
Intercontinental Hotel, Paris
Refurbishment of 450 bed flagship Hotel. Including detailed negotiations and design
Kingdom Trade Center, Riyadh
Mixed use 300m tower block comprising offices, retail, apartments
AL Bustan Palace Hotel, Oman
Extensive alterations and refurbishment of prestigious Hotel
Holiday Inn, Mayfair
Fitout of new 161 room Hotel as part of the major One Blackfriars Road development
Hyatt Regency London, The Churchill
Major Incident Recovery Works and refurbishment of guestrooms
Enskilda Bank, London
Fit-out of London office building including upgrade of electrical infrastructure
Hyatt Regency London, The Churchill
Multiple projects within this 5-Star Hotel over a period of 10 years
Racing Post, Cannon House, London
Design of air conditioning for offices installed whilst fully occupied
Nevsky 25, St Petersburg
Design of M,E&P services for the redevelopment of historic building
W Hotel, Leicester Square
Detailed design and co-ordinated building services as part of the refurbishment
Halfway Green, Walton on Thames
Design of M,E&P for new build office development
Stafford Hotel, London
Guestroom refurbishment which Hotel remained open
242 Marylebone Road
Refurbishment and infrastructure upgrade of 8,000m²
Visa Office, British Embassy, Abu Dhabi
New 3-storey offices with phased occupation
St Ermin’s Hotel, London
Complete Refurbishment of Grade II listed building
No. 1 Palace Street, London
Refurbishment of central London offices with alterations and improvements to central cooling plant
Staceys Street, Maidstone
Design of M,E&P design for 2 new build speculative offices in excess of 5500m² office spac
British Embassy, Kathmandu
Refurbishment of Embassy building whilst occupied
2, Babmaes, London
Full M&E Cat B Fit-Out including Lighting Design
Sitting room with full air conditioning concealed within the ceiling
Adjoining Residences in London with 19 bedrooms
Majlis (Reception) in Penthouse Suite
Cooled pool at Diplomatic Residence in Middle East
Terrace at Corinthia Apartments
London Residence with Pool below garden and modern interior
Diplomatic Residence Central London
Master bathroom London Suite
Tallest
Saudi Kingdom Trade Center 300m
Air Miles
Foreign & Commonwealth Office in Far and Middle East (Manila, Hong Kong and many more)
Temperature Extremes
Saudi Arabia +50°C
Radisson Edwardian, Mayfair
Conversion of office building into 5-star plus hotel and luxury residences